{"id":650,"date":"2024-07-23T23:17:22","date_gmt":"2024-07-23T13:17:22","guid":{"rendered":"https:\/\/www.iwbc.org.au\/?page_id=650"},"modified":"2026-10-12T18:31:17","modified_gmt":"2026-10-12T08:31:17","slug":"white-bay-power-station","status":"publish","type":"page","link":"https:\/\/www.iwbc.org.au\/index.php\/white-bay-power-station\/","title":{"rendered":"White Bay Power Station"},"content":{"rendered":"\n<p><br><\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" src=\"https:\/\/www.iwbc.org.au\/wp-content\/uploads\/2025\/04\/image-1024x768.jpeg\" alt=\"\" class=\"wp-image-828\" width=\"630\" height=\"472\" srcset=\"https:\/\/www.iwbc.org.au\/wp-content\/uploads\/2025\/04\/image-1024x768.jpeg 1024w, https:\/\/www.iwbc.org.au\/wp-content\/uploads\/2025\/04\/image-650x488.jpeg 650w, https:\/\/www.iwbc.org.au\/wp-content\/uploads\/2025\/04\/image-768x576.jpeg 768w, https:\/\/www.iwbc.org.au\/wp-content\/uploads\/2025\/04\/image-1536x1152.jpeg 1536w, https:\/\/www.iwbc.org.au\/wp-content\/uploads\/2025\/04\/image-2048x1536.jpeg 2048w, https:\/\/www.iwbc.org.au\/wp-content\/uploads\/2025\/04\/image-1200x900.jpeg 1200w\" sizes=\"(max-width: 630px) 85vw, 630px\" \/><figcaption>New path taking shape from Victoria Rd underpass to White Bay Power Station and Robert St<\/figcaption><\/figure>\n\n\n\n<p>The Rozelle Interchange (RIC) project has provided a pedestrian and cycling underpass of Victoria Rd and a link to the Anzac Bridge cycleway from the new Rozelle Railyards Parklands.  Meanwhile the nearby disused White Bay Power Station  has been restored and repurposed as an Arts and Cultural centre, and the White Bay Metro Station is currently being constructed in the same  precinct, on Sydney Ports land. High rise apartment blocks are also planned as part of the Bays West Masterplan.<\/p>\n\n\n\n<p>It was obvious looking at the plans for the RIC that links to the WBPS and Metro Station and further to East Balmain would be feasible and needed from the new underpass, but these links were \u201dout of scope\u201d so weren\u2019t provided by Westconnex, although they were not precluded. Bike Leichhardt had raised these possibilities with RIC and Transport for NSW, and Keith Stallard from Rozelle had also been lobbying for Active Transport links and Green Corridors to and from the Power Station.  He received a grant for some green corridor work east of Buchanan St and was instigator  of the Rozelle Parklands Active Transport Hub Alliance.<\/p>\n\n\n\n<p>Keith, with support from IWBC, wrote to Placemaking NSW, the body responsible for the Power Station and surrounding public domain, about the need for a path connecting the Power Station to the Parklands, with support from Bike Leichhardt and IWBC. We were pleasantly surprised to receive an invitation to meet with their management. We were even more happy to learn that they had been working on the same concept plus an upgrade of the adjacent Victoria Rd path, which we had been calling for for years. Westconnex was supposed to deliver an improved path but did little more than some painted lines around the huge sign poles on the path. <\/p>\n\n\n\n<p>Placemaking NSW have seen the obvious potential for new links. They also are responsible for managing the WBPS  and events there. After the recent Biennale showed up some active Transport deficiencies, namely dangerous shared paths and inadequate crossings on Victoria Rd and Robert St, they applied and received funding for an improvement scheme. The project has a budget of $17 m and they are busy coming up with designs for three  improvements. They said they want to have work finished by end of 2025.  More Active Transport links are likely after the Metro is finished in about 2030 but they didnt want  to wait that long.<\/p>\n\n\n\n<p>The <a href=\"https:\/\/www.whitebaypowerstation.com\/editorials\/new-walking,-cycling-and-landscaping-improvements\">projects they are working on<\/a> are:<\/p>\n\n\n\n<ol><li>A shared path from the Power Station forecourt on Robert St to the Victoria Rd underpass, linking to the Anzac Bridge cycleway and the Rozelle Parklands paths. This path will be about 200m long, straight and 5 m wide and similar to the path in the Parklands, with a painted line separating riders and walkers. [Note in April 2025: path is finished but will only be open for special events initially. No firm date for general public use. Note in October 2026- see end of post]<br><\/li><li>A widened shared path on Victoria Rd  east of Robert St, bypassing  around (we hope) the large sign poles that restrict the current path. Cantilevering the path  off the cliff face behind the Power Station may be needed. We stressed the need to provide a buffer to the heavy traffic on Victoria Rd. <br><\/li><li>A three way signalled intersection at Mullens St to provide safer crossing for pedestrians, and an upgraded shared patg from Mullens St to Victoria Rd. We discussed the possibility of a bypass round the back of the bus shelter half way up the hill, the lack of which has been a problem for cyclists and bus patrons. The bypass would be on Power Station land so shouldn&#8217;t be a problem.<\/li><\/ol>\n\n\n\n<p>IWBC wish them well and wish other Authorities were as willing to improve Active Transport and to consult early with interested community groups.<\/p>\n\n\n\n<p>[<strong>Note in October 2026<\/strong>. The path we had high hopes for between Robert St and the Anzac Bridge path has been completed, but remains locked most of the time. It is opened once a week for the Balmain Bike Bus, run by CCBR Active Transport Group, and if needed during events at the Power Station. <\/p>\n\n\n\n<p>There is new management at the Power Station and they do not seem to be as interested in opening the new path, talking of \u201dsecurity\u201d. It may never open as a shortcut, since a permanent path will be part of the Bays West development, which is years away.<\/p>\n\n\n\n<p>Better news is that the new set of lights has been constructed at the Mullens\/Robert intersection, which has bicycle crossings on two legs. The shared path outside the Power Station entrance has been upgraded. No bike paths on Mullens unfortunately.<\/p>\n\n\n\n<p>Also, rumour has it that work on widening the shared path up the hill on Robert to Victoria Rd and  along the SW side of the Power Station is about to start. An access road has been built in below the path, presumably to allow contractors in to work on the path, which will need underpinning or canter levering  we suspect.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" src=\"https:\/\/www.iwbc.org.au\/wp-content\/uploads\/2026\/10\/IMG_8125-1024x647.jpeg\" alt=\"\" class=\"wp-image-936\" width=\"630\" height=\"398\" srcset=\"https:\/\/www.iwbc.org.au\/wp-content\/uploads\/2026\/10\/IMG_8125-1024x647.jpeg 1024w, https:\/\/www.iwbc.org.au\/wp-content\/uploads\/2026\/10\/IMG_8125-650x411.jpeg 650w, https:\/\/www.iwbc.org.au\/wp-content\/uploads\/2026\/10\/IMG_8125-768x485.jpeg 768w, https:\/\/www.iwbc.org.au\/wp-content\/uploads\/2026\/10\/IMG_8125-1536x971.jpeg 1536w, https:\/\/www.iwbc.org.au\/wp-content\/uploads\/2026\/10\/IMG_8125-1200x758.jpeg 1200w, https:\/\/www.iwbc.org.au\/wp-content\/uploads\/2026\/10\/IMG_8125.jpeg 1905w\" sizes=\"(max-width: 630px) 85vw, 630px\" \/><figcaption>Proposed Robert St\/Victoria Rd shared path.<\/figcaption><\/figure>\n\n\n\n<p>The plan we were shown last year had the new path finishing short of the top of the hill,  with one pole left, the last big light pole eastbound. too big to move they said, and cant go round because its too close to the Power Station walls. So a squeeze point will still be present, but at least it is near the top. ]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Rozelle Interchange (RIC) project has provided a pedestrian and cycling underpass of Victoria Rd and a link to the Anzac Bridge cycleway from the new Rozelle Railyards Parklands. Meanwhile the nearby disused White Bay Power Station has been restored and repurposed as an Arts and Cultural centre, and the White Bay Metro Station is &hellip; <a href=\"https:\/\/www.iwbc.org.au\/index.php\/white-bay-power-station\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;White Bay Power Station&#8221;<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/www.iwbc.org.au\/index.php\/wp-json\/wp\/v2\/pages\/650"}],"collection":[{"href":"https:\/\/www.iwbc.org.au\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.iwbc.org.au\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.iwbc.org.au\/index.php\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iwbc.org.au\/index.php\/wp-json\/wp\/v2\/comments?post=650"}],"version-history":[{"count":7,"href":"https:\/\/www.iwbc.org.au\/index.php\/wp-json\/wp\/v2\/pages\/650\/revisions"}],"predecessor-version":[{"id":938,"href":"https:\/\/www.iwbc.org.au\/index.php\/wp-json\/wp\/v2\/pages\/650\/revisions\/938"}],"wp:attachment":[{"href":"https:\/\/www.iwbc.org.au\/index.php\/wp-json\/wp\/v2\/media?parent=650"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}